What is Aggregate Planning? – Importance and its Strategies
February 12, 2025
What to do when Businesses and Professionals Stagnate Stagnation can happen to anyone. Whether they are businesses, nations, societies, groups, or individuals, the prospect of withering away due to lack of growth or career mobility or opportunities can make even the most resilient of the institutions to atrophy and stagnate. Indeed, the fact that there […]
China has seen rapid development in the past two or three decades. It has become the export powerhouse of the world. However, Chinese companies were always considered to be the cheap imitators. Chinese companies were earlier contractors for American and European countries who provided cheap labor to assemble their high tech products. However, this has […]
Sweden is not really a country that comes to find when one talks about finance or currency trading. The Swedish Krona is a relatively small and insignificant player in the global market. Trading in Swedish Krona accounts for less than 2% of the global currency trades. However, the Krona is what many call a counter […]
If the data type that needs to be charted is discrete, then it must fall between one of binary or count types. As the name suggests in case of binary distribution, there are only two possibilities, success and failure, defective and not defective, whereas in the case of count type distribution there may be more […]
How to Create a Pareto Chart ? A Pareto chart is one of the 7 basic tools of quality control. It is for this reason that every student of quality management needs to know how to prepare and how to read a quality chart. The procedure for the same has been listed below: Step 1: […]
The production system design planning considers input requirements, conversion process and output. After considering the forecast and long-term planning organization should undertake capacity planning.
Capacity is defined as the ability to achieve, store or produce. For an organization, capacity would be the ability of a given system to produce output within the specific time period. In operations, management capacity is referred as an amount of the input resources available to produce relative output over period of time.
In general, terms capacity is referred as maximum production capacity, which can be attained within a normal working schedule.
Capacity planning is essential to be determining optimum utilization of resource and plays an important role decision-making process, for example, extension of existing operations, modification to product lines, starting new products, etc.
A technique used to identify and measure overall capacity of production is referred to as strategic capacity planning. Strategic capacity planning is utilized for capital intensive resource like plant, machinery, labor, etc.
Strategic capacity planning is essential as it helps the organization in meeting the future requirements of the organization. Planning ensures that operating cost are maintained at a minimum possible level without affecting the quality. It ensures the organization remain competitive and can achieve the long-term growth plan.
Capacity planning based on the timeline is classified into three main categories long range, medium range and short range.
Production capacity is the maximum output possible from equipment under normal working condition or day.
Sustainable capacity is the maximum production level achievable in realistic work condition and considering normal machine breakdown, maintenance, etc.
Effective capacity is the optimum production level under pre-defined job and work-schedules, normal machine breakdown, maintenance, etc.
The ultimate goal of capacity planning is to meet the current and future level of the requirement at a minimal wastage. The three types of capacity planning based on goal are lead capacity planning, lag strategy planning and match strategy planning.
Effective capacity planning is dependent upon factors like production facility (layout, design, and location), product line or matrix, production technology, human capital (job design, compensation), operational structure (scheduling, quality assurance) and external structure ( policy, safety regulations)
There would be a scenario where capacity planning done on a basis of forecasting may not exactly match.